The AI Operating System for Preconstruction
Built for general contractors' preconstruction and estimating teams. Piper measures quantities, generates trade scopes, levels sub bids, and reviews the estimate, with the source behind the work.
Built for general contractors' preconstruction and estimating teams. Piper measures quantities, generates trade scopes, levels sub bids, and reviews the estimate.
Chats are stored for 90 days. Avoid sharing confidential information.

Piper in action
The problem
Too much preconstruction time is spent assembling information, not improving the work
Days are lost finding, extracting, and reconciling information across drawings, specs, addenda, quotes, schedules, and spreadsheets
Historical costs, company standards, and lessons learned remain scattered across files and people
Senior team members cannot personally review every scope, bid, estimate, schedule, and project decision
Late changes and manual reviews create scope gaps, rework, missed dependencies, and margin risk
Piper turns that fragmented process into a repeatable preconstruction system
USE CASE 01
Build with Piper
Build your own construction apps and workflow automations
When your team needs something Piper does not do out of the box, build it on the same project documents, sources, and data.
- Apps and automations that start out knowing the project
- Every number traced to the page it came from
- Connected to your systems and to the rest of Piper

USE CASE 02
Scope Generation
Know exactly what you're asking each trade to carry
Turn drawings, specifications, addenda, and company standards into source-backed trade scopes.
- Build trade scopes from the project, not from memory
- Surface unclear boundaries and missing scope before solicitation
- Keep every requirement linked to its source

USE CASE 03
Bid Leveling
Know what you're actually carrying
Compare subcontractor bids against the intended scope so the low number does not hide an expensive gap.
- Compare bids against the scope, not just each other
- Surface exclusions and gaps before you pick a carry
- See the leveled number and the evidence behind it

USE CASE 04
Final Bid Review
Challenge the estimate before you stand behind it
Review the estimate against the project behind it and focus senior attention on what still deserves judgment.
- Find scope with no cost assigned
- Catch duplicated or stale carry decisions
- Focus senior review on what still needs judgment

USE CASE 05
Survey
Ask the right questions on every project, and make the next one better
Turn your company's experience into a repeatable survey that captures what the team learns and improves over time.
- Run your company's best questions on every project
- Surface unanswered risks before they disappear
- Turn lessons learned into a process that improves over time

USE CASE 06
Scheduling
Build the preconstruction schedule from the project, not from a blank page
Draft a CPM preconstruction schedule from the project documents, with every activity linked to its source, and hand it off in P6 or Microsoft Project format.
- Draft the schedule from the project documents
- Keep every activity linked to its source
- Check the logic before it goes out, then export to P6

USE CASE 07
Takeoff
Turn complex drawing sets into quantities you can check
Measure areas, lengths, and counts manually, with assistance, or through an agent. Keep the measurements editable and on the drawings behind them.
- Draw, trace rooms, and find similar symbols
- Ask the agent to build a takeoff you can inspect and edit
- Group quantities by item and connect your catalogs and pricing formulas

01 / 07
USE CASE 01
Build with Piper
Build your own construction apps and workflow automations
When your team needs something Piper does not do out of the box, build it on the same project documents, sources, and data.
- Apps and automations that start out knowing the project
- Every number traced to the page it came from
- Connected to your systems and to the rest of Piper
Build with Piper
Piper does these out of the box. Anything else, build it
When your team needs something no tool ships, build your own construction apps and workflow automations on Piper. They start from the project documents, sources, and data Piper already has.
It already knows the project
Construction documents
Bid packages of thousands of pages, read in full, with revisions and addenda understood.
Every number is traced
Source tracing
Anything your app or automation shows links back to the page it came from.
Connected, not another island
Integrations
Integrations with your systems, and the same live numbers as the rest of the team.
Explore Build with PiperPiper helped us streamline complex processes and shorten work cycles while improving accuracy and overall quality. It makes complex work simpler, day-to-day tasks easier, and the team behind it is exceptional.
Smadar ArbelHead of Business Development and Marketing
Having worked on both sides of the owner, GC relationship, I can confidently say Piper delivers something rare: it accelerates deep project understanding while surfacing the priorities that matter most. That combination gives teams a clear and durable advantage.
Meirav Haramati20+ Years of Experience in RFP Management
In construction, strong pricing starts with knowing the project inside and out. Before Piper, that required an impossible amount of manual review and still left room for blind spots. Piper does the heavy review work, flags risks early, and gives us confidence that our estimates are grounded in the project documents, helping us win work while protecting margin.
Pini LibermanCEO of a $3B General Contractor
Piper has significantly streamlined how I review and organize project information. It helps turn scattered inputs into clear, structured outputs. Work that used to take nearly two hours is now much faster and more accurate, making the entire process easier and more consistent.
Linoi SiboniAdministrative Manager | Peam Projects

Piper removes busy work from the critical path and turns the package into decision-ready, source-linked clarity
Protect your margins early
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge, with every finding linked to its source. See our Privacy Policy.










